Adrian and Stese roll down the hill into the arrivals platform when we were testing the levels.  I subsequently removed a panel aided by Stese and we re-levelled the loop.
Adrian and Stese roll down the hill into the arrivals platform when we were testing the levels. I subsequently removed a panel aided by Stese and we re-levelled the loop.
26th January 2008
Acton Work Party 26th Jan 08
Matt's miniature and not so miniature railway and nautical ramblings @ fotopic.net
Previous | Next

Comments left about this photograph:
None

Added on 26th January 2008, has been viewed 82 times